Pulse Security Limited
Security systems installed, maintained, repaired and upgraded with care.
Pulse Security installs, maintains and repairs CCTV, access control, door entry, intruder alarms and network infrastructure for schools, commercial premises, residential sites and transport environments. We are often called in when inherited systems need to be understood, kept running or brought up to standard.
Supporting commercial, education and residential sites across London, Surrey and the South of England.
Services
Security and network systems for live, working sites.
We support new installations, system upgrades, fault investigation and planned maintenance, with particular strength in mixed, inherited and business-critical systems that need a practical route forward.
CCTV / VSS
Digital/IP, analogue and hybrid CCTV, including NVRs, DVRs, remote viewing, recording faults, upgrades and system recovery.
Access Control
TDSi GARDiS and Paxton access control, including controllers, readers, door hardware, user issues, custom mounts and fault diagnostics.
Door Entry
Audio, video and GSM entry systems for controlled entrances, offices, communal doors, apartment blocks and gates.
Intruder Alarms
Domestic and commercial alarm systems designed around the building, the users and the level of response required.
Structured Cabling
New data cabling, cabinets, patch panels, PoE switching, cable management and maintainable network infrastructure.
Fibre Optic Networks
Fibre optic installation for resilient CCTV, access control, building-to-building connectivity and site network backbones.
Fault Finding & Maintenance
Experienced with the systems already on site.
Not every job starts with a blank drawing. Many sites have older equipment, undocumented changes and faults that only appear under certain conditions. We work methodically through the system so the cause is found, not just the symptom.
Camera faults, DVR/NVR issues, recording gaps, power problems, remote-viewing failures, network drops, hard-drive replacement and upgrade planning.
TDSi GARDiS, Paxton, reader faults, door controllers, custom mounts, locks, releases, exit buttons, PSU issues and user-management problems.
Routine checks, asset records, firmware and storage reviews, door testing, camera checks and recommendations before small issues become disruptive faults.
Project control
Clear surveys, quotations, RAMS, engineer reports and completion paperwork.
Our own Pulse Management Pro system helps keep enquiries, quotations, design proposals, site assets, engineer reports and completion documents organised from first call to handover.
- Site surveys with practical recommendations
- Clear scopes of work and design proposals
- Custom 3D-printed brackets, spacers and adaptor mounts
- Risk assessments and method statements
- IPAF qualified and DBS checked attendance where required
- Asset records for cameras, controllers and switches
- Engineer reports and completion certificates
- Ongoing maintenance, fault finding and upgrade support
Proof points
Built for live sites, not just neat drawings.
Our work includes active depots, schools, commercial premises and residential properties where clear communication, tidy delivery, appropriate site access and reliable handover matter.
Documented equipment records support maintenance, additions, fault finding and future upgrades.
Multi-site records help support planned works, fault response and consistent documentation.
Security work delivered under the Pulse Security name, building on the earlier Pulse Installations cabling background.
Data cabling and fibre work began under Pulse Installations and now continues under the Pulse Security name.
Need a quote or a site visit?
Tell us what needs installing, upgrading or repairing and we'll help shape a practical next step for your site.